Update on probe into George building collapse

22 May 2024 | SANews


Premier Alan Winde and members of his government received a status update from the team of structural engineers appointed by the Western Cape Government (WCG) to investigate the cause of the George building collapse, that occurred on 6 May 2024.

V3 Consulting Engineers is leading the provincial government’s investigation, which comprises several phases.

The search and recovery operation was concluded on Friday, 17 May, and the site was then handed over to the South African Police Service (SAPS).

The WCG’s probe was launched just a day after the tragedy. “While we are aware of other investigations that are under way by other bodies, this incident happened in our province and impacted our residents. As Premier I have a responsibility to our residents to ensure that we get the answers that everyone is seeking,” said Premier Winde.

It was emphasised that the collecting of samples from the site had to be done as soon as possible before the rubble was removed to ensure the integrity of the process. At the same time, it was important to ensure that no investigation interfered with the search, rescue, and recovery operation.

Material samples needed to be collected and meticulously documented. “The process began as soon as the investigating team arrived on site and was undertaken with the cooperation of the SAPS. Evidence was collected under the supervision of the SAPS. “We will continue to work together until the conclusion of all investigations. We will do everything possible to ensure this entire process is handled with the professionalism and delicacy that it deserves. But we also have a commitment to the residents of this province to help them understand what happened and if steps need to be taken what actions should be taken,” the Premier said.

Documents that are being sourced include:

  • Construction drawings;
  • Planning and approval applications;
  • Occupational Health and Safety reports; and
  • Site diaries.

Once all the documents are sourced and all materials are collected, they are accordingly analysed.

Technical testing will also be carried out, which is part of a geotechnical assessment.  Interviews will also be conducted with service providers involved in the project.

Premier Winde stressed that this must be a clinical, thorough process to ensure that all evidence that is processed and documented will be sufficient enough to hold up in any ensuing legal matter. “There must be consequences for this tragedy,” he emphasised, adding, “We owe this to the victims and their families. We also have a responsibility to ensure that everything is done to prevent a similar tragedy like this happening in our province again.”

The Premier extended his condolences to the loved ones of another patient who was extracted from the debris but has since passed away in hospital.



Garden Route District MM shares words of appreciation to Role-players of partially-built Building Collapse Rescue and Recovery Operations

For nearly two weeks since 6 May 2024, the town of George in the Western Cape, South Africa experienced a disaster unimaginable when a partially-built building collapsed with workers from South Africa, Zimbabwe, Malawi, Mozambique and Lesotho trapped inside.

The collapse prompted a unified response of experts from Local, Provincial and National Government. Individuals from a diverse background joined together to support the families affected by the tragedy and to keep everyone informed as each minute of the rescue and recovery efforts unfolded. Local rescuers and teams from across the country, including urban search and rescue experts, rescue technicians, doctors, paramedics, firefighters, K-9 Police dogs with their dog-handlers, machinery operators, law enforcement, forensic experts, and support personnel worked tirelessly at the site, extracting workers from the rubble.

Hospitals were inundated with patients, and volunteers, as well as Non-Governmental Organisations (NGOs) and Faith Based Organisations rallied to provide assistance to the rescue teams. A church choir and spiritual leaders were also at the site to provide comfort. As the days went by, the Multi-Agency Command Centre (MACC) coordinated by Gerhard Otto, Garden Route District Municipality’s (GRDM) Manager for Disaster Management, released updates with the assistance of Communicators from GRDM, George, Western Cape Government Department of Local Government, SAPS, as well as WCG Health and Wellness, to members of the public and media regarding the latest status of the rescue and recovery efforts.

At the MACC were representatives present from WCG, GRDM, George Municipality, Emergency Medical Services, the South African Police Service, The Forensic Pathology Service, National Department of Employment and Labour and the WCG Department of Social Development to name a few.

The MACC was operational 24/7 with morning and afternoon briefing sessions taking place for all role-players to discuss their plans of action. The last successful rescue was that of 32-year-old living miracle, Gabriel Guambe who was retrieved on 11 May 2024. Gumba was trapped under the rubble for 118 hours. His miracle rescue created tears in the eyes as soon as it became public knowledge. This successful rescue created new hope for all families and residents who waited anxiously for more rescues to occur.

While not all stories ended in success, the collective resilience and solidarity of the community was evident throughout the ordeal. In total, and as per the last media statement issued by the MACC on Friday, 17 May 2024, of the sixty-two workers (62) who were affected by the collapse, twenty-nine (34) were rescued, however to date six patients afterwards unfortunately passed away in hospital. No one could have known that the Garden Route would be faced with such a tremendous nightmare, but to witness the people of George and Garden Route coming together to pray and provide support in this incident that created a tremendous cloud of adversity over the town, one can only take from it a lifetime of memories created by the incident.

The dedicated rescue services and support provided by the golden hearts through their good deeds to those involved in the rescue mission, are just a few to be mentioned. Monde Stratu, Municipal Manager of GRDM, visited the site on a daily basis to get to terms and understand the intensity of the incident and rescue mission. Stratu expressed his gratitude to every single official, person, and organisation, the whole of South Africa, who worked non-stop, on and off the site and to every single media representative, photographer and communicator who kept the whole of South Africa informed regarding the progress of the rescue operations.

Stratu furthermore thanked all government organisations, municipalities and the private sector who prioritised their past two weeks in the best interest of the workers and their families affected by the incident. In offering condolences to those who lost loved ones, Stratu emphasised that the whole Garden Route grieves alongside them. “He said: “As you mourn the loss of your mother, father, son, daughter or sibling, remember the entire Garden Route mourns with you. May their departed souls rest in peace.”


 

 

error: eRadio is protected !!